K-TEK Corporation K-TEK Corporation - Weldments, Light Assemblies & Enclosures
Home Contact Us Send a CAD File Why Choose K-Tek? Industries Served Quality
Products & Services
Design
Short & Long Run Stamping
Metal Assemblies
Sheet Metal Fabrications
Prototyping/Low Volume
Tool Building
Wire Forming
 
Sample of Our Work
Contact Us - Contact us to learn more about our product

About Us

We are a division of Griffiths Corporation which was founded in Minnesota as a short run stamper in the mid-1960's. K-Tek Corporation started in the early 1980's and grew out of their customer's need for a full service supplier.

K-Tek moved from Minnesota to a nearby 15-acre site in western Wisconsin in 1988. The plant doubled in size in 1993 and again in 2000. K-Tek is now the largest Griffiths plant at 100,000 square feet. We have land available and future goals to continue our growth.

QUALITY CONTROL DEPARTMENT

1 - Bendix- Cordex CMM Mod. 1808 Note - All inspection equipment is
      W/QC 5000 Software       Calibrated to NIST Standards.
1 - Deltronic Optical Comparator Various handheld micrometers,
1 - KOCOUR K1000 Plating Tester calipers, and protractors
1 - Wilson Hardness Tester Mod. 3-TT-BB 6 - Surface Plate Workstations
1 - Virtek Laser QC6 - Height Gages

TOOL ROOM
1 - Fanuc Robocut 1 c wire EDM machine 2 - Johnson Horizontal Cutoff Saws
5 - Bridgeport Milling Machines 2 - Surface Grinder up to 12" x 24"
2 - 15" Lathes 4 - 15" Drill Presses
1 - Quantum q-111500V, Machine Tool 34" x 62" 1 - Grob Vertical Handsaw

PUNCH PRESS
1 - 400 Ton Straight Side w/Uncoiler and Feeder 1 - 100 Ton Cincinnati 10' NC Brake
2 - 300 Ton Straight Side w/Uncoilers and Feeders 1 - Amada 345 Turret Press with
1 - 200 Ton OBI w/Uncoiler and Feeder Auto Load and Unload
2 - 150 Ton OBI w/Uncoilers and Feeders 1 - Mazak Champ 1000 Watt Laser
1 - 110 Ton OBI w/Feeder and Straightener       w/4' x 8' Bed
1 - 75 Ton OBI w/Uncoiler and Feeder 1 - Wysong 10' x 1/4" Mild Steel Shear
3 - 60 Ton OBI Variable Speed w/Uncoilers 1 - Nissan Lift - 8,000 lb. Cap.
      and Feeders 1 - Ten Thousand lb. Overhead Crane
7 - 60 Ton OBI 1 - Torex 22 cu. ft. Auto Unload Vibrator
7 - 35 Ton Bliss OBI1 - Almco Vibrator 10 cu. ft.
1 - Sweco 1 1/2" cu. ft. Vibrator 1 - Timesaver 18" (Sanding)
1 - 60 Ton 6' Accurpress Press Brake 1 - Amada Vipros 358 Turrit Press King II
1 - Nissau Lift 5000 LB Cap 1 - 5 Ton Overhead Crane RTM Brand

ASSEMBLY DEPARTMENT
8 - Spotwelders 50-250 KVA 3 - Haeger Automatic Multi-Station
1 - Heli-Arc Welder       Pem Setter
1 - Panasonic WR008A Robotic Welding Cell 1 - Benchmaster Riverter
1 - Airco Wire Feed 1 - Radial Riverter
1 - Fully Equipped Assembly Line 1 - Dual Head Tapper
2 - Hobart Wire Feed Welders 1 - Multiple Head Tapper
1 - Hyundai Hit 185 CNC lathe 1 - Kia Vertical Machining Center

TWO CAD/CAM SYSTEMS
2 - Dell - Pentium 3 Workstations - w/Windows NT, 21" Monitor
      1 - 1 E-Size Plotter
      Iges, DXF, Compatible
      AutoCAD 2000 File Formats Accepted: DWG, DXF, IGES
      Striker SS-Die Design Software w/Auto Cross Sectioning
      SS-AutoDetail Software for Automatic Component Detailing & CNC Software
      HP DesignJet 450C Printer
      Solidwork's Design Software
      Surf Cam Matching Cam Software

Virtual Tour

  1. Click "START" below to begin the tour.
  2. Click the tour to go to the next page of the tour.
  3. When finished, select a new page from the index on the right, or click the "BACK" button on your browser to return to this page.
START

Employment -

1ST SHIFT TOOL MAKERS.    QUALIFIED CANIDATES WILL POSSESS 2+ YEARS OF EXPEREIENCE IN METAL STAMPING AND/OR IN THE METAL FABRICATION INDUSTRY. PRESS ROOM EXPERIENCE IS STRONGLY PREFERRED. MUST BE ABLE TO INTERPRET TOOL DRAWINGS AND DESIGNS. COMPENSATION WILL BE COMMENSURATE WITH DIRECT RELATED EXPERIENCE. GREAT OPPORTUNITY TO WORK FOR A STABLE, LONG-TERM GROWTH ORIENTED EMPLOYER. 

1st SHIFT WIRE FORMING OPERATOR/SET-UP. STRONG BACKGROUND IN WIRE FORMING IS REQUIRED. PRECISION SHEET METAL EXPERIENCE IS HELPFUL.  COMPENSATION WILL BE COMMENSURATE WITH DIRECT RELATED EXPERIENCE. GREAT OPPORTUNITY TO WORK FOR A STABLE, LONG-TERM GROWTH ORIENTED EMPLOYER. 

1ST AND 2ND SHIFT PRESS SET-UP PERSONNEL.CANIDATES WILL POSSESS PREVIOUS SET-UP EXPERIENCE. PRESS SIZES RANGING FROM 35 – 400 TON. EXPERIENCE IN METAL FABRICATION IS A MUST.  COMPENSATION WILL BE COMMENSURATE WITH DIRECT RELATED EXPERIENCE. GREAT OPPORTUNITY TO WORK FOR A STABLE, LONG-TERM GROWTH ORIENTED EMPLOYER. 

 

E-mail resumes to: April.Miller@ktek-net.com
Fax resumes to: (715) 684-3050

For more details, contact April Miller at (715) 684-3033.

 

Members of Griffiths Corporation: K-TEK, D-TEK, WRICO Site Map
Site Credits: Ecreativeworks
 
Contact Us